AIR Resource Scheduling and Usage Tracking for 2005


The purpose of this page is to track the scheduling and usage of the resources from the AIR-Group, notably the Van Gogh and Rembrandt clusters and associated network resources.

A new page has been created for the resource scheduling for 2006: SNEResourcesScheduling2006

Scheduling period

The time period we are covering in this page is from Apr. 1 2005 to the end of the year.
In particular we are interesting in the usage during the two main events of the year: iGrid2005 and SC2005:

Resources

There are two clusters that can be reserved:

Network equipment

There are two network switches, with the following 10GE ports:
The available ports for host connections are as of Jun.1 2005:

Conditions

Please note that usage of our resources is bound to conditions you must agree with:

Read the above and then if you agree send your request to: to-be-filled-in<at>science.uva.nl
Lightpath requests need to be send to: netmaster-optical<at>surfnet.nl

Priorities


100 = our group
90 = groups we work with toward a publication
80 = groups or organizations we have a funding relation with (SURFnet, NextGrid)
70 = groups on science park we collaborate with (SARA, NIKHEF)
60 = groups not on science park we collaborate with (OptIPuter, NORTEL, DAS3, etc.)
50 = organisations we push, work with or develop (GLIF, Gloriad, GN2, etc)
10 = rest.

Vangogh cluster

The following is the table showing the first two outstanding reservations for a resource.
Note that if higher priority request come up this can be re-arranged.
NODE REQUEST START-DATE END_DATE NEXT-REQUEST
vangogh0 - - - -
vangogh1 - - - -
vangogh2 - - - -
vangogh3 - - - -
vangogh4 - - - -
vangogh5 - - - -
vangogh6 - - - -
vangogh7 - - - -
vangogh8 - - - -


Rembrandt cluster

The following is the table showing the first two outstanding reservations for a resource.
Note that if higher priority request come up this can be re-arranged.
NODE REQUEST START-DATE END_DATE NEXT-REQUEST
rembrandt0 - - - -
rembrandt1 Request 8.b Sep.1 2005 ongoing
rembrandt2 Request 8.b Sep.1 2005 ongoing
rembrandt3 Request 1.b Aug.1 2005 end of Dec.
rembrandt4 Request 1.b Aug.1 2005 end of Dec.
rembrandt5 Request 1.b Aug.1 2005 end of Dec.
rembrandt6 Request 15 Oct.23 Jan. 31 2006
rembrandt7 Request 15 Oct.23 Jan. 31 2006
rembrandt8 Request 15 Oct.23 Jan. 31 2006


Current requests

REQUEST PRIORITY REQUESTOR TIMEFRAME DETAILS REMBRANDT RESOURCES VANGOGH RESOURCES NOTES
1.b 70 Kors Bos Aug.1 <->Aug.31 (option on 30 Sep.) 2005 Continuation of SC3 tests. Extension of request1 Rembrandt3,4,5 - Nodes are needed till the end of December
8.b 100 Paola/Hans +JPVerlders August test of SURFnet6 Rembrandt6 &7 - -
14 70 Simon Portegies Zwart DAS-3 - - Nodes to test GRAPE PCI card
15 100 Leon SC|05 Token-based tests Rembrandt6/7/8 - Need three nodes for Intel switch tests


Request contacts

REQUEST CONTACT PERSON ORGANIZATION EMAIL ADDRESS
1 Kors Bos NIKHEF/SARA tier1-ams@sara.nl
8 Paola Grosso UvA AIR grosso@science.uva.nl
14 Simon Portegies Zwart UvA/astro spz@science.uva.nl
15 Leon Gommans UvA/AIR gommans@scicence.uva.nl


Old requests

REQUEST PRIORITY REQUESTOR TIMEFRAME DETAILS REMBRANDT RESOURCES VANGOGH RESOURCES NOTES EMAIL
2 60 LAC/UIC not specified Loan of node (with 10GE) for Teraflow testbed Rembrandt6 - Need S2IO/Neterion NIC mike@lac.uic.edu
3 100 Freek/Jeroen iGrid'05 Demo NL104 - VanGogh7-8 - fdijkstr@science.uva.nl
4 60 EVL (viz. people) - TeraScale - but I think they first need 4x 1 GE links before they can use it (don't know the status) darkman@evl.uic.edu
5 Joe Mambretti iGrid2005 demo US108 Vangogh3-4 Assigning them two nodes - one additional node assigned on Sep.21 (vangogh1) j-mambretti@northwestern.edu and fyeh
5.b Joe Mambretti iGrid2005 demo US109 Vangogh3-4 They are using the same two nodes as request 5, with account name teraflow1 and teraflow2 j-mambretti@northwestern.edu and fyeh
6 60/100 Alan Verlo (STARLight) & Paola/Hans Apr.15 2005 - May 30 2005 Test of new Ams-Chi link and test of Chelsio card in trans-oceanic transfers Rembrandt7 - - darkman@evl.uic.edu
7 60 Nut Taesombut iGrid2005 demo US116 Rembrandt7-8 Request for 4-6 cluster nodes with 30GByte disk space nut@cs.ucsd.edu
8 100 Paola/Hans +JPVerlders mid April/end May initial test of SURFnet6 Rembrandt2 - - grosso@science.uva.nl
9 60 Les Cottrell May-beginning July TCP-stack comparison - vangogh1-2 - cottrell@slac.stanford.edu
10 70 Bram Stolk Jul 1 - Oct 1 iGrid2005 demo - - requested 28 gigabit copper ports on Force10 bram@sara.nl
11 100 Bas iGrid05 and SC|05 Demo NL101& Demo NL103 - Vangogh5-6 Two nodes for VM turntable demo wan@science.uva.nl
12 60 Leping Yin iGrid05 Demo US124 - 2 nodes:vangogh2 and rembrandt5 Access to at least 2 nodes, and OXC. lyin2@uic.edu
13 60 Marcus Thiebaux iGrid05 Demo US128 - - Need Globus 2.4.3 and scheduler (PBS or LSF) thiebaux@ISI.EDU
16 100 Paola SC|05 Resource Broekering demo - Vangogh3 and vangogh4 Will use two nodes for demonstration of resource brokering grosso@science.uva.nl